This part is made for a computer

Dorris on a computer is laid out for a big screen, and on a phone it's too cramped to click around in. Open this page on a computer to see every tool. Or try the iPhone app here: it has the same made-up customers, but only a few of the tools.

Try the iPhone appBack to Look inside

A real Dorris, with a made-up store. The screens Tim's store uses every day. Every customer, order and number in it is invented.

Dorris

Articles Setting up your Ridgeline 2P
published

The Ridgeline 2P pitches in about five minutes once you have done it once. Here is everything in the bag, and the order we set it up in.

What's in the bag

Part

Qty

Tent body

1

Rain fly

1

Hubbed pole set

1

Aluminum stakes

8

Guylines (already attached)

4

Pitching it

  1. Lay out the footprint (sold separately) with the logo at the head end.

  2. Unfold the tent body on top and stake out the four corners.

  3. Snap the hubbed poles together and clip the body on, starting at the hub.

  4. Throw the fly over, match the color-coded buckles, then snug the straps.

  5. Stake out both vestibules, then the guylines.

Pitching in the rain? Put the fly up first on the poles, then clip the body in underneath. It stays dry the whole time.

Specs

  • Trail weight: 4 lb 2 oz

  • Floor: 88 x 52 in, peak height 42 in

  • Two doors, two vestibules